SLAB DONE :)

Saturday 26th September 2009 saw the pouring of the slab. 7:30am start and there were plenty of willing hands ready to go, although it was quite cold, windy with another dust storm, although not as bad as a few days ago.

concrete1

concrete2

Half way. Getting the truck down the side was thanks to a bit of good driving and a lot of good luck. Photo below shows how tight the fit was.

concrete7

concrete3

All had been clean sailing up until last (4th) truck failed to show. Steve was on the phone quick smart, but it was more than 1/2 hour before it arrived. The weather had turned really nasty with icy winds freezing the poor fellas.

concrete4

The boys have smoko while Steve puts the helicopter over the slab.

rory

The apprentice watches the drinks while the rest of the workers get back to the job

concrete5

concrete5b

pond

Thankfully hardly any concrete overs, but what was left Diesel used to start off my fish pond.

concrete6

The finished slab 3:00pm. Poor Steve 2, was kept busy all day putting in braces all the way around, as you can see.

TOTAL  COST:  $13,891.24 including original excavation for pad and driveway.

Comments (1)

RONJune 29th, 2010 at 2:59 pm


PillSpot.org. Canadian Health&Care.No prescription online pharmacy.Special Internet Prices.Best quality drugs. Online Pharmacy. Order pills online

Buy:Viagra Soft Tabs.Maxaman.Viagra Super Active+.Zithromax.Cialis.Levitra.Viagra Professional.Tramadol.Propecia.VPXL.Viagra.Cialis Super Active+.Cialis Soft Tabs.Super Active ED Pack.Viagra Super Force.Cialis Professional.Soma….

Leave a comment

You must be logged in to post a comment.